Please submit manuscripts in either of the following two submission systems

    ScholarOne Manuscripts

  • ScholarOne
  • 勤云稿件系统

  • 登录

Search by Issue

  • 2024 Vol.31
  • 2023 Vol.30
  • 2022 Vol.29
  • 2021 Vol.28
  • 2020 Vol.27
  • 2019 Vol.26
  • 2018 Vol.25
  • 2017 Vol.24
  • 2016 vol.23
  • 2015 vol.22
  • 2014 vol.21
  • 2013 vol.20
  • 2012 vol.19
  • 2011 vol.18
  • 2010 vol.17
  • 2009 vol.16
  • No.1
  • No.2

Supervised by Ministry of Industry and Information Technology of The People's Republic of China Sponsored by Harbin Institute of Technology Editor-in-chief Yu Zhou ISSNISSN 1005-9113 CNCN 23-1378/T

期刊网站二维码
微信公众号二维码
Related citation:
【Print】   【HTML】   【PDF download】   View/Add Comment  Download reader   Close
Back Issue    Advanced Search
This paper has been: browsed 3645times   downloaded 3397times  
Shared by: Wechat More
Machines, Tools and Tool Transporter Concurrent Scheduling in Multi-machine FMS with Alternative Routing Using Symbiotic Organisms Search Algorithm
Author NameAffiliationAddress
M.Padma Lalitha Electrical Engg.Dept.,Annamacharya Institute of Technology and Sciences, Rajampet, AP, India Electrical Engg.Dept.,Annamacharya Institute of Technology and Sciences, Rajampet, AP, India
N.Sivarami Reddy* Mechanical Engg. Dept., Annamacharya Institute of Technology and Sciences,Rajampet, AP, India Mechanical Engg. Dept., Annamacharya Institute of Technology and Sciences,Rajampet, AP, India
K. L. Narasimhamu Mechanical Engg. Dept., Sreevidyanikethan Engineering College, A.Rangampet,AP, India 
I. Suneetha Electronics and Communication Engg. Dept.,Annamacharya Institute of Technology and Sciences, Tirupati, AP, India 
Abstract:
This study explored the concurrent scheduling of machines, tools, and tool transporter (TT) with alternative machines in a multi-machine flexible manufacturing system (FMS), taking into mind the tool transfer durations for minimization of the makespan (MSN). When tools are expensive, just a single copy of every tool kind is made available for use in the FMS system. Because the tools are housed in a central tool magazine (CTM), which then distributes and delivers them to many machines, because there is no longer a need to duplicate the tools in each machine, the associated costs are avoided. Choosing alternative machines for job operations (jb-ons), assigning tools to jb-ons, sequencing jb-ons on machines, and arranging allied trip activities, together with the TT"s loaded trip times and deadheading periods, are all challenges that must be overcome to achieve the goal of minimizing MSN. In addition to a mixed nonlinear integer programming (MNLIP) formulation for this simultaneous scheduling problem, this paper suggests a symbiotic organisms search algorithm (SOSA) for the problem"s solution. This algorithm relies on organisms" symbiotic interaction strategies to keep living in an ecosystem. The findings demonstrate that SOSA is superior to the Jaya algorithm in providing solutions and that using alternative machines for operations helps bring down MSN.
Key words:  machines, tool transporter and tools scheduling  FMS  tool transporter  symbiotic organisms search algorithm.
DOI:10.11916/j.issn.1005-9113.2022069
Clc Number:TP13
Fund:

LINKS