Effect of membrane surface loading on wastewater treatment by a gas-water alternate membrane bioreactor
DOI:
CSTR:
Author:
Affiliation:

(Shenzhen Key Laboratory of Water Resource Application and Environmental Pollution Control, Harbin Institute of Technology Shenzhen Graduate School, 518055 Shenzhen,Guangdong,China,dwy1967@yahoo.com.cn)

Clc Number:

TU992.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To improve the treatment efficiency of a gas-water alternate membrane bioreactor (AMBR) and make full use of the membrane module, the efficiency of membrane surface loading on synthetic municipal wastewater treatment by the AMBR was investigated through a lab-scale experiment. The results showed that: the maximum COD, NH4+-N and TN removal load by AMBR were 84.9,6.75 and 6.5 g/(m2·d) under the condition of intra-membrane oxygen pressure lower than 200 kPa and the C/N ratio of raw water was 10. The oxygen supply rate and nitrification rate were the main factors for COD and TN removal by AMBR separately, but both of the oxygen supply rate and nitrification rate influenced the NH4+-N removal.

    Reference
    Related
    Cited by
Get Citation
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 02,2010
  • Revised:
  • Adopted:
  • Online: November 09,2017
  • Published:
Article QR Code