引用本文: | 孙岳阳,胡少伟,乔艳敏,陆俊,胡登兴.BCCP内水压承载能力原型试验[J].哈尔滨工业大学学报,2020,52(5):171.DOI:10.11918/201906011 |
| SUN Yueyang,HU Shaowei,QIAO Yanmin,LU Jun,HU Dengxing.Prototype test on the bearing capacity of BCCP under internal water pressure[J].Journal of Harbin Institute of Technology,2020,52(5):171.DOI:10.11918/201906011 |
|
|
|
本文已被:浏览 1784次 下载 925次 |
码上扫一扫! |
|
BCCP内水压承载能力原型试验 |
孙岳阳1,2,胡少伟1,乔艳敏1,陆俊1,胡登兴3
|
(1.南京水利科学研究院 材料结构研究所,南京 210024; 2.河海大学 水利水电学院,南京 210024; 3.宁夏青龙管业股份有限公司,银川 750004)
|
|
摘要: |
为了研究钢筋缠绕钢筒混凝土压力管(BCCP)在内水压作用下的承载破坏特征,设计了三个不同管径的BCCP内水压现场原型试验.在管径1 800 mm BCCP的钢筒、钢筋和混凝土保护层上布置环向应变片,逐级施加内水压至2.5 MPa,得到了各部位在内水压作用下的受力变化规律.主要结论如下:BCCP从生产时施加预应力到承受内水压至最终破坏的受力过程可分为5个阶段.1)管芯受预应力钢筋环向作用力阶段.缠筋后,钢筒与混凝土形成的管芯受到一个初始预压应力;2)保护层开裂前整管承受内水压弹性阶段.对应于试验中内水压小于1.5 MPa的阶段,管芯依然受压,而预应力钢筋和外混凝土保护层受拉;3)保护层开裂,管芯承受内水压弹性阶段.试验中当内水压达到1.6 MPa后,保护层开始达到抗拉强度开裂,混凝土管芯也从初始的受压慢慢转变为受拉,依然处于弹性状态;4)管芯开裂,钢筒和钢筋受拉弹性阶段.当内水压达到2.2 MPa后,管芯径向开裂,但是钢筒和钢筋的应力随内水压依然稳步增长;5)管道破坏阶段.钢筒和预应力钢筋达到最终屈服强度,整管丧失承载能力.研究成果可为BCCP在输调水工程中的推广使用以及相关标准的制定提供依据. |
关键词: 钢筋缠绕钢筒混凝土压力管(BCCP) 内水压 试验 应变 承载能力 |
DOI:10.11918/201906011 |
分类号:TV332 |
文献标识码:A |
基金项目:国家自然科学基金(8,1) |
|
Prototype test on the bearing capacity of BCCP under internal water pressure |
SUN Yueyang1,2,HU Shaowei1,QIAO Yanmin1,LU Jun1,HU Dengxing3
|
(1.Materials & Structural Engineering Department, Nanjing Hydraulic Research Institute, Nanjing 210024, China; 2.College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210024, China; 3.Ningxia Qinglong Pipes Industry Co. Ltd., Yinchuan 750004, China)
|
Abstract: |
In order to study the full-range failure process of bar-wrapped cylinder concrete pressure pipe (BCCP) under internal water pressure, tests on three prototype BCCPs with different diameters were designed. Annular strain gauges were arranged on the cylinder, steel bar, and concrete protective cover of the BCCP with a diameter of 1 800 mm, and the force response of each part under the action of internal water pressure was obtained by increasing the applied internal water pressure to 2.5 MPa step by step. It was found that the load-bearing process of BCCP from prestressing to ultimate failure could be divided into 5 stages. First, the concrete core was subjected to the force of the prestressed steel bar without protective cover. After being wrapped, the core formed by cylinder and concrete was subjected to an initial pre-compression stress. Second, the whole pipe was in the elastic stage before the protective cover cracked. It corresponded to the stage when the internal water pressure in the test was less than 1.5 MPa, and the core was still under pressure, while the prestressed steel bar and the outer concrete protective cover were under tension. Third, the concrete core was in the elastic stage after the protective cover cracked. When the internal water pressure arrived at 1.6 MPa, the cover reached the tensile strength and began to crack, and the concrete core also transformed from the initial compression to tension slowly and remained in elastic state. Fourth, the cylinder and the steel bar were in the elastic stage of tension after the concrete core cracked. As the water pressure arrived at 2.2 MPa, the concrete core cracked radially, but the stress of cylinder and bars still increased steadily with the internal water pressure. Fifth, the pipe was completely destroyed. The cylinder and the steel bars reached the ultimate yield strength, and the whole pipe lost its bearing capacity. The research results could provide basis for the popularization and application of BCCP in water transfer engineering and the formulation of relevant standards. |
Key words: bar-wrapped cylinder concrete pressure pipe (BCCP) internal water pressure test strain bearing capacity |
|
|
|
|